ACC Inspection Request
ACC Policies Sec. 14.7.5 Inspections: There are several required inspections by Administration Staff during the construction period. Following 24-hour advance notice by the property owner or their designee, staff will perform on-site inspections prior to the following stages of construction: Erosion Control, Setbacks, Storm Water System, Driveway, Final.