IMPORTANT: Painting on the Roadways

In addition to the previously posted construction work, we are having fog and center lines painted on roadways throughout the association.  This work is performed by a painting truck which continuously moves over the road.  Due to the nature of this work, we cannot provide a specific time and location of the work, but our best estimates are below.  Please follow the below instructions to avoid overspray – we don’t want your cars in the way, but we’d really hate for overspray to hit your vehicle!

From Monday through Thursday (8/28-8/31), please park AT LEAST TEN FEET FROM FOG LINES (the white lines on the side of the road) in the following areas during the hours of 8am-6pm:

When?

Monday through Thursday (8/28-8/31), 8am-6pm.

 

Where?

Gate 1 Gate 2 Gates 3, 9, 13 Gate 5
Horizon Hill Ln Barn View Ct Cascade Ln Arabian Way
Longshore Ln Club House Cir Deer Run Ln Bigleaf Ln
Marina Dr Grand View Ln Glacier Ridge Dr Bramble Way
North Point Dr Lake Louise Dr Green Hill Rd Clematis Ln
The Marina Park Marigold Dr Harbor View Dr Louise View Dr
Windward Dr Morning Beach Dr Hillside Pl Pinto Creek Ln
    Honeycomb Ln Tumbling Water Dr
    Jasper Ridge Ln Wisteria Ln
    Little Strawberry Ln  
    Lost Fork Ln  
    Lost Lake Ln  
    Maple Ct  
    Morning Glory Dr  
    Polo Park Dr  
    River Ridge Lp  
    Rocky Ridge Dr  
    Stable Ln  
    Sudden Valley Dr  
    Valley Crest Way  
    Western Ln  

We apologize for any inconvenience and thank you for your assistance as we complete projects to improve our community.