Road Work Update 7/28/19 as of 10:30pm

Re: Micro Sealing Situation Report for Monday 07/29/19

Situation

a. The following is the scope of work for this operational period

Marigold Dr Loop to  Lake Louise Dr

Closure: 1 Lane

Grandview / Sunflower Cir Marigold Dr Lake Louise Dr

Closure: 1 Lane

Marigold Dr Lake Whatcom Blvd Lake Louis Dr

Closure: Pilot Car/one way

Whispering Cedars / Lake Louise Dr

Closure: 1 Lane

Updates

Re: Micro Sealing Situation Report for Monday 07/29/19

Situation

a. The following is the scope of work for this operational period

Marigold Dr Loop to  Lake Louise Dr

Closure: 1 Lane

Grandview / Sunflower Cir Marigold Dr Lake Louise Dr

Closure: 1 Lane

Marigold Dr Lake Whatcom Blvd Lake Louis Dr

Closure: Pilot Car/one way

Whispering Cedars / Lake Louise Dr

Closure: 1 Lane

Updates

a. This report will be updated at 4:00 PM on 07/29/19 for the next operational period for 07/30/19.

a. This report will be updated at 4:00 PM on 07/29/19 for the next operational period for 07/30/19.