Re: Micro Sealing Situation Report for Monday 07/29/19
Situation
a. The following is the scope of work for this operational period
Marigold Dr Loop to Lake Louise Dr
Closure: 1 Lane
Grandview / Sunflower Cir Marigold Dr Lake Louise Dr
Closure: 1 Lane
Marigold Dr Lake Whatcom Blvd Lake Louis Dr
Closure: Pilot Car/one way
Whispering Cedars / Lake Louise Dr
Closure: 1 Lane
Updates
Re: Micro Sealing Situation Report for Monday 07/29/19
Situation
a. The following is the scope of work for this operational period
Marigold Dr Loop to Lake Louise Dr
Closure: 1 Lane
Grandview / Sunflower Cir Marigold Dr Lake Louise Dr
Closure: 1 Lane
Marigold Dr Lake Whatcom Blvd Lake Louis Dr
Closure: Pilot Car/one way
Whispering Cedars / Lake Louise Dr
Closure: 1 Lane
Updates
a. This report will be updated at 4:00 PM on 07/29/19 for the next operational period for 07/30/19.
a. This report will be updated at 4:00 PM on 07/29/19 for the next operational period for 07/30/19.