Three failing underground storm water culverts are being replaced during the first part of September 2020. The failed culverts are located at the intersection of Polo Park Road and Summer Bell Lane. To safely replace the culverts, there will be a planned road closure and scheduled power outages to residents.
- A road closure will impact Summer Bell Lane starting September 16, 2020.
- Summer Bell Lane will be open for residents to walk to their homes. Residents living on Summer Bell Lane will need to access the street from the west side of Polo Park Drive (Gate 13 side)
Electrical (PSE controlled) outages are needed to ensure that construction workers are safe while replacing culverts under buried under high voltage lines. Homes on Gray Birch Lane, Summer Bell Lane, and Cedar Place will experience power outages on Thursday September 17, 2020, between 8:00 AM and 3:30 PM and again on Monday September 21, 2020, between 8:00 AM and 3:30 PM.
Addresses impacted:
• Cedar Place: 1, 2, 3, 4, 5, 7, 8, 9, 10 and 12
• Gray Birch Ln: 1, 2, 5, 9, 10, 11, 16 and 18
• Polo Park Dr: 94
• Summer Bell Ln: 1, 2, 4, 5, 6, 7, 8, 9 and 12
- Date of outage: Thursday, September 17 & Monday, September 21
- Estimated outage duration: Up to six (6) hours
- To occur sometime between: 8:00 a.m. – 3:30 p.m.
Updates will be posted should there be a change in the above information.