Upcoming PSE Work scheduled in Gate 2

October 15th, 2019:

Marigold Drive [8:00 a.m.] – Add topsoil and straw to exposed dirt areas.

Orchid Court – Add topsoil and straw to exposed dirt areas.

Ranch House Condos [10:00 a.m.] – Check/top-off cold patch locations.

Morning Beach Drive: Add topsoil in area of the underground vault.

Estimated start time for inspection and topping-off existing road cold patch – 12:00 p.m. Work will occur in sequence listed.

West lane of Marigold by Center Condos: Top-off cold patch in settling areas. Compact as needed.

Valley View Court to Orchid Court (Ridge Field Condos): Inspect and top-off cold patch areas.

October 16th, 2019:

Morning Beach Drive: Starting about 9:00 a.m., re-work river rock by vault for added erosion control.