Category Archives: Community Announcements

Meet Your 2025 HOA Board of Director Candidates

We are excited to announce the candidates running for positions on the Board of Directors and Committees. Each of these individuals is dedicated to serving our community and contributing their time, energy, and expertise to strengthen Sudden Valley.

🗳️ Candidates for the Board of Directors

  • Linda Bradley
  • Jean Maixner
  • Joseph Adam
  • Sean Chaffee

Candidate for the Architectural Control Committee

  • Terry Niblack


Your participation ensures a strong, representative, and effective HOA. Please take time to learn about each candidate and cast your vote to help shape the future of our community.

Watch the Sudden Valley You Tube Video HERE



Notice: Change of Date for Opening of Candidate Applications and Lottery

Due to illness, the opening of the Candidate Applications and Lottery for ballot placement will now take place in the Dance Barn on Wednesday, September 3, 2025, at 4:45 PM.

Please note: The deadline to submit applications remains unchanged — all applications must be submitted by Tuesday, September 2, 2025, at 4:30 PM.

To watch the opening of applications live, join the Zoom meeting here: https://us02web.zoom.us/j/84647671152?pwd=MHZJVkJhclRsT0RwdHR3cFplQUhRQT09

Thank you for your understanding.

Register for Online Voting!

As an option, Sudden Valley Community Association (SVCA) is introducing online voting for the Annual General Meeting (AGM) using e-ballots. Members may still opt to vote in person or by mailed paper ballot. There is one vote per household regardless of the method of voting.

Members who consent to receive an e-ballot will receive their Official Ballot via cell phone text/email sent by UniLect Election Services. The e-ballot will include Voting Instructions and the Voter Booklet.

IMPORTANT DATES & TIMES (Pacific Time)

  • The cutoff to consent to receive an e-ballot is 12PM on Monday, October 27, 2025.
  • The cutoff to vote via e-ballot is 4:30 PM Friday, October 31, 2025 (same as mailed paper ballot).
  • Initial e-ballots will be sent to all consenting members at 9AM on Wednesday, September 24, 2025.
  • Subsequent e-ballots will be sent each Wednesday from October 1-29 to members who consent after 5PM on Wednesday, September 17, 2025 and before 12PM on Monday, October 27, 2025.

Click here to register to receive an e-ballot!

Reservoir Demolition Notice

On Monday, August 25, 2025, a contractor for Lake Whatcom Water and Sewer District will begin demolition of the existing 1-million gallon welded-steel Division 7 reservoir constructed in 1970. The reservoir location is near Swallow Circle in Gate 2. The water reservoir demolition is part of the District’s larger, multi-year effort to replace the aging tank with two 237,900 gallon reservoirs, together totaling 475,800 gallons. The project provides seismic improvements and implements an earthquake early warning system (ShakeAlert®) to automatically isolate a portion of the volume from rapid depletion due to possible water main breaks following an earthquake. 

Demolition will proceed in accordance with a pending Whatcom County Demolition Permit and Northwest Clean Air Agency approved demolition permit #25-413, attached. Lead was detected in the tank’s paint and primer and the contractor is required to perform lead abatement and containment in accordance with the applicable laws, regulations, and codes of the Occupational Safety and Health Administration (OSHA), the Washington Industrial Safety and Health Act (WISHA) and any Federal, State, County or local requirements related to the demolition, handling, loading, transporting, recycling, and/or disposals of the materials related to this work. No asbestos was detected in the reservoir materials.

The demolition work is expected to take approximately 3 weeks and will be followed with site restoration. Please direct any project questions to Greg Nicoll, P.E., District Engineer for Lake Whatcom Water and Sewer District (360.734.9224, greg.nicoll@lwwsd.org).

Please note that the reservoir is not located on Sudden Valley property and Sudden Valley is not involved in this project.

Temporary Lake Louise Trail Closure – UPDATE 8/14/25

UPDATE 8/14/25: The timeframe for the work has been changed from the week of 8/18 to sometime in September. The contractor will be proofing the conduit during the week of 8/18, which will not result in the trail’s closure.

Lake Whatcom Water & Sewer District has a project to pull fiber optic cable from the Ranch House lift station (4 Marigold) to Louise lift station (11 Larkspur). 

The estimated closure would be 8:00am-5:00pm for one day in September, with the possibility of extending to a second day.

LWW&SD will provide at least a 72 hour notice ahead of any closure request, and will provide onsite signage for the duration. Above is a map of the project location for clarification.